The Six-Figure Mistake Most GCs Don't See Coming — Until It's Too Late
Most mechanical failures on a project aren't installation failures. They're clarity failures — and they happen months before a single pipe goes in the ground. By the time a mechanical change order lands on your desk, the damage is already done. The scope was ambiguous at bid. The equipment strategy wasn't stress-tested. The sequence of operations got rubber-stamped instead of reviewed. What looks like a field problem in month six was actually a decision problem in month one.
Myrel Joseph Roehm Jr
Aug 232 min read